INStallatION INStRUCtIONS (CONtINUED)

Essential Information

Care must be taken to ensure that the dryer is not subject to flows (even
peaks) in excess of the dryers rated capacity, e.g. dryers downstream
of an air receiver have increased potential to be overflowed.
The dryer can be installed free standing, secured to the floor via the
fastening points provided in the base or secured to a wall using optional
brackets.
The dryer must be installed vertical and level. Suitable rated pipe and
connections must be used for the installation. All pipework must be secure
and safely positioned.
The purge flow is factory set for 100 psig (7 bar) inlet pressure operation.
Should the minimum pressure requirement be different, the purge flow
must be reset by an Alpha-Pure engineer or an Alpha-Pure approved agent.
Ensure the dryer is electrically connected to a supply suitable for the unit.
Filtration
A 0.01 micron coalescer and a 1 micron particle after filter is to be installed
before and after the MMR dryer.
Filters must be maintained by Alpha-Pure or an Alpha-Pure approved agent.
By-pass line
A by-pass line ensures complete safety during maintenance and enables a
continuous supply of compressed air to be maintained if required. It should
be remembered that air bypassing the dryer is dirty untreated air.
After filter
Outlet
Figure 1
10
pre filter
Inlet
Isolation Valve (Outlet)
Bypass Valve
Isolation Valve (Inlet)
Figure 2
Outlet
Inlet