Cut The Blower Banding Straps; Install The Plumbing - Kohler K-723 Guide D'installation

Baignoire à jets d'air
Masquer les pouces Voir aussi pour K-723:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5. Cut the Blower Banding Straps

IMPORTANT! This step is necessary to make your Kohler bath operate more quietly.
Use tin snips to cut the two blower banding straps from the blower.
To minimize noise and vibration, be sure the blower is not in direct contact with the shipping
bracket after the banding straps are cut. The blower control contains rubber isolation feet to reduce
blower noise.

6. Install the Plumbing

CAUTION: Risk of property damage. A watertight seal must exist on all bath drain connections.
The watertight seal will prevent property damage.
Connect the drain to the trap according to the drain manufacturer's instructions.
NOTE: To simplify future maintenance, provide access to all plumbing connections.
Install the faucet valving according to the faucet manufacturer's instructions. Do not install the
faucet trim until instructed. Open the hot and cold water supplies, and check the supply
connections for leakage.
Run water into the bath, and check the drain connections for leakage.
Kohler Co.
All manuals and user guides at all-guides.com
Wiring Harnesses
Rubber Isolation Feet
Cut the banding straps.
Blower
Motor
Control
9
1143444-2-A

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

K-724

Table des Matières