Dometic MASTERFLUSH MF7100 Instructions De Montage Et De Service page 15

Masquer les pouces Voir aussi pour MASTERFLUSH MF7100:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Macerator Toilet
15
c. With hose clamp, attach hose to water valve
(freshwater model) or pump (sea water model)
barbed fitting (fig. 15).
d. Place loose end of supply hose up through hole
of plastic cover. Lower and fit cover to macerator
pump.
16
e. Connect water supply hose to rim flush check
valve with hose clamp (fig. 16).
5. Plan electrical, water supply and discharge plumbing
according to appropriate toilet system layout (refer to
toilet system layout figures on pages 11 – 12).
Create access holes for plumbing and electrical
supplies to toilet.
EN
17
6. Place toilet in final location, and fasten it to floor with
hex head fasteners and washers at sides and rear of
base (fig. 17).
7. Plan flush switch location so that electrical
connections and wires cannot get wet.
18
8. Use switch template (packed separately) to mark
location of fasteners and switch access hole. Cut out
access hole (fig. 18).
Refer to wiring diagram on reverse side of toilet
I
parts list.
Installation
15

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Masterflush mf7200

Table des Matières