NOTICE: Please inspect the unit thoroughly before installation to make sure it has not been damaged during transportation. Under
no circumstances should a damaged unit be installed. Neither Maax Bath nor the distributor will be responsible for removal or
reinstallation costs should a replacement be necessary due to installation of a damaged unit.
*Please read ALL installation instructions before beginning.
• Review job print and Maax rough-in dimensions; verify all key
dimensions against actual job conditions.
• In remodeling, if necessary, add studs at each end to provide a
vertical nailing surface for the side flanges of unit.
• Make sure wall structure is level, square and plumb; check floor
for level. Some shimming between the stud frame and fixture may
be required.
• If fire-rated framing pocket is required, approved finish material
must be in place prior to unit installation to meet fire safety
requirements of local building code.
NOTE: Wall structure must have interior dimensions shown on
rough-in diagram to permit installation of unit.
• If the sub-floor is uneven, shims may be needed under the legs for
additional support.
• Provide 6" (150mm) diameter floor opening for drain connection
for shower, or a 6" x 12" floor opening for tub.
• Make sure all plumbing is complete and to code.
Shower Mounted Fittings:
If mounting ttings on tub or shower, from stable reference points (back wall studs, oor), measure the locations of shower
arm and valves. Note measurements:
Shower Arm: ___________________________________ Valve: ____________________________________
(Mark dimensions only if shower arm is plumbed within bath fixture wall area.)
Tub Spout: _____________________________________
(If applicable.)
Pre-Installation Planning
Customer Service: 1-877-GET-MAAX (1-877-438-6229).
— 2 —

Installation steps

To avoid obstruction, make sure that the supply lines and the
plumbing valve do not protrude inside the structure during
installation.
On inside of plumbing wet wall of unit, note location of supply
elbow and mixer valve. (See "Shower Mounted Fittings" below.)
To prevent scuffing while installing unit, cover the floor of the unit
with a piece of cardboard or other protective material.
If installing shower door refer to the shower door installation
instructions for any special considerations.
NOTE: Where local codes specify minimum door openings,
shower stalls may require swing (not sliding) doors.