Electrical Wiring; Standard Electrical Wiring; Notes - Riello 40 FS20 Manuel D'entretien Et D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3.4

ELECTRICAL WIRING

3.4.1 STANDARD ELECTRICAL WIRING

Ionization probe
Electrode
Ignition transformer
Air pressure switch
Motor
Blue
White
Black
D4275
ATTENTION:
Do not swap neutral and phase over, follow the diagram shown carefully and carry out a good earth connection.
The section of the conductors must be at least 1mm . (Unless requested otherwise by local standards and legislation).
The electrical wiring carried out by the installer must be in compliance with the rules in force in the country.
Verify that the burner stops by operating the boiler control thermostats and that the burner locks out by separating
the red ionisation probe lead connector.

NOTES

The burners have been type-approved for intermittent operation. This means they must stop at least once every 24 hours in
order to allow the electrical control box to check its efficiency on start-up. The boiler limit thermostat (TL) normally ensures
the burner halts. If this does not happen a time switch halting the burner at least once every 24 hours must be applied in se-
ries to limit thermostat (TL).
20025548
Connector
Burner earth
Control box
RMG 88.620A2
~
230V
5
GB
KEY TO LAY-OUT
XP6 – 6 pole socket
XP7 – 7 pole socket
X6 – 6 pin plug
X7 – 7 pin plug
B4 – Working signal
h1 – Hour counter
PG – Minimum gas pressure
switch
S3 – Remote lock-out signal
(230V - 0.5 A max.)
T6A – Fuse
TL – Limit thermostat
TS – Safety thermostat
V10 – Safety valve
V11 – Adjustment valve
CARRIED-OUT
IN THE FACTORY
TO BE DONE BY
THE INSTALLER
ATTENTION
In the case of phase-phase
feed, a bridge must be fit-
ted on the control box ter-
minal
board
terminal 6 and the earth
terminal.
50Hz
between

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

20025109

Table des Matières