Fix the tap off box on the busbar,
tightening the hanger provided on
the screws added previously.
6
Insert the joint inside the appropriate
hole.
8
Accommodate the 2 flanges and tight
them to the element with the screws
supplied.
10
Revisione 2
K SERIES
Loosen
paying attention to not unscrew them
completely,
polystyrene layers from the joint.
7
Screw the joint until the bolts head is
broken. Check the torque (should be
80Nm).
9
Install the copper twist and fix it to
the tap off box (ground connection of
the tap off box).
11
Pag. 3 di 4
1000 - 5000 A
the
screws
of
and
remove
ISTR-K- K25DV60PDV_rev 02.doc
the
joint,
the