ELECTRIC SHOCK, SHORT-CIRCUIT, LEAKS, FIRE OR Multilingual fluorinated OTHER DAMAGE TO THE EQUIPMENT. BE SURE ONLY greenhouse gases label TO USE ACCESSORIES MADE BY DAIKIN WHICH ARE SPECIFICALLY DESIGNED FOR USE WITH THE EQUIPMENT AND HAVE THEM INSTALLED BY A Handling PROFESSIONAL.
In accordance with the foundation drawing in the figure, fix the ELECTING INSTALLATION SITE unit securely by means of the foundation bolts. (Prepare four sets of M12 foundation bolts, nuts and washers each which are available on the market.) Make sure to provide for adequate measures in order It is best to screw in the foundation bolts until their length are to prevent that the outdoor unit be used as a shelter 20 mm from the foundation surface.
Allowable pipe length Installation of refrigerant piping is possible as front connection, side connection and bottom connection. See the table below concerning lengths and heights. Refer to figures 2~5. Assume that the longest line in the figure corresponds with the actual longest pipe, and the highest unit in the figure corresponds with the actual highest unit.
In case of simultaneous operation system NOTE Refer to the table for stop valve tightening Upward and downward piping should be performed at the main torques. piping line. Be sure to use both a spanner and a torque Use branch piping kit (optional) for branching refrigerant pipes. wrench when connecting or disconnecting pipes Precautions to be taken.
Leak test Pair system: refer to figure 2 Evacuate the pipes and check vacuum. (No pressure increase for 1 minute.) L1 (m) one way length of liquid pipe Break the vacuum with a minimum of 2 bar of nitrogen. RP200 G=(L1–30)x0.06 Conduct leak test by applying soap water, etc.
Point for attention regarding quality of the public electric power LECTRICAL WIRING WORK supply All wiring must be performed by an authorized electrician. This equipment complies with EN/IEC 61000-3-11 provided that the system impedance Z is less than or equal to Z at the All components procured on the site and all electric construction interface point between the user's supply and the public system.