Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 54
Power/Ignition test
Testing opera-
tion
Before testing the connection to power and to
ignition make sure you have carried out the
steps described in the previous chapters.
1. Please check all connections to LINK 300/
310 (wires, fuses etc.).
2. Turn on the ignition. The LED must be on
with occasional (100ms) periods off.
3. Turn off the ignition. The LED must now be
off with occasional (100ms) periods on.
If the LED does not perform accordingly see
Diagnostics on page 24.

Testing operation

GPRS / GPS reception test
For this test, you may need to move the
vehicle to a location with a clear view of the
sky, to make sure that you have adequate GPS
and GPRS reception.
For this test put the LINK 300/310 into the
place where you want to affix it (please see
Mounting LINK 300/310 on page 14).
1. Turn on the ignition.
2. Monitor the LED. It must be on with
occasional (100ms) periods off.
3. Please wait until the LED stops flashing.
If the LED keeps flashing longer than 10 min see
Diagnostics on page 24.
13
EN

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Link 310

Table des Matières