Installation
Step 2: Orient the QuickNet floor heating mat
Lay out the mat according to your design, using as few
turns as possible and ensuring that the cold lead is near
the electrical junction box. Remove the clear plastic lining
and roll out the mat with the adhesive side down to
temporarily hold it in place. See Figure 4. If it is necessary
to change direction, see step 3.
Note: When installing a 240 V QuickNet mat with an
Extension mat to accommodate a floor over 100 ft
the mats so that the red mesh is edge to edge, the heating
cable spacing is no less than 3 inches, and both cold leads
can reach the electrical junction box. See Figure 6.
240 V
80 sq. ft.
Figure 6: Laying out floor over 100 ft
If it is necessary to remove the heating cable from the
mesh to route around an obstacle, be sure to maintain at
least 3 inches of separation between the heating cables.
12
English
2
, align
240 V
50 sq. ft.
Cold
Cold
lead
lead
2
6
Installation
Step 3: Change the direction of the mat to fit floor design
To make a turn in the direction the mat is being installed,
cut the mesh with scissors being careful not to damage
the heating cable.
Figure 7: Cutting the mesh
Then align the mat in the desired direction ensuring that
the adhesive side of the mat is down and continue to roll it
into position.
Figure 8: Changing direction
Cold lead
Cold lead