Raychem QuickNet Manuel D'installation page 11

Système de chauffage par le plancher
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6
Installation
Step 7: Embed the floor heating mat in mortar
After laying out the floor heating mat and routing the cold
lead and the floor temperature sensor to the electrical junc-
tion box, apply a thin coat of self-leveling mortar or acrylic
or latex modified thin-set over the mat. Be sure to use
the flat side of the trowel to avoid any damage to the mat.
Spread the mortar evenly over the mat filling in all voids
between the floor, mesh and heating cable. Once the sur-
face is smooth and even, allow it to cure to a hard surface
before installing the tile or stone.
Figure 11: Applying self-leveling mortar or acrylic or
latex modified thin-set
Step 8: Repeat the Insulation Resistance Test, Heating
Cable Resistance Test, and the Sensor Resistance Test
(After embedding in mortar)
Important: You must repeat the insulation resis-
tance test, heating cable resistance test, and the sensor
resistance test to ensure that the heating cable and floor
sensor have not been damaged. For information on how
to perform these tests, see Section 7, Commissioning.
Record the results in the Commissioning Record in
Section 9.
Step 9: Install the tile/stone
To install the tile or stone, apply a layer of acrylic or latex
modified thin-set using the ridged side of your trowel. Tile
and grout the floor using best industry practices and in
accordance with instructions provided by the manufacturer
of the tile or stone.
Do not power the QuickNet heating mat until the thin-set
and grout are fully cured.
16
English
6
Installation
Step 10: Repeat the Insulation Resistance Test, Heating
Cable Resistance Test, and the Sensor Resistance Test
(After floor covering)
Important: You must repeat the insulation resis-
tance test, heating cable resistance test, and the sensor
resistance test to ensure that the heating cable and floor
sensor have not been damaged. For information on how
to perform these tests, see Section 7, Commissioning.
Record the results in the Commissioning Record in
Section 9.
Step 11: Install the QuickStat thermostat
Refer to the document QuickStat Thermostat Installation
and Operation Manual (H57725), included in the thermostat
box for instructions on how to install the thermostat.
Step 12: Program the QuickStat thermostat
Refer to the document QuickStat Thermostat Installation
and Operation Manual (H57725) included in the thermostat
box for instructions on how to program the thermostat.
17
English

Publicité

Table des Matières
loading

Table des Matières