INSTALLATION PROCEDURE
1. Open the Unifit Rough-In
packaging. Follow the Unifit
Rough-In Installation instruction to
complete the rough-in installation
(ill. 1).
2. Place the template into position
and follow its instructions to
prepare for installing the toilet.
Do not move the Unifit Rough-
NOTICE
In on the Floor Flange after
wax seal is set. If this notice is
disregarded, discard the wax
ring and replace with new wax
ring.
3. Place the toilet over the Unifit Rough-
In and the two mounting blocks, by
aligning the toilet outlet with the
Unifit Rough-In opening (ill. 2).
Insert the toilet all the way
NOTICE
into position. If this notice
is disregarded, leakage may
result.
4. Align the toilet perpendicular to
the back wall and parallel to side
walls; it should not sit crooked or
diagonal (ill. 3).
ill.1
Wax seal
ill.2
ill. 3
4
Screw
Mounting block
Uni t
Nut
Washer