5. Adjust the overall height of the support
frame. Loosen and re-tighten the 4 screws
in the height adjustment slots as
necessary. Insert 16 screws (3.9x9.5mm),
and 8 lock washers (D.4.3) located in the
Hardware Package (Fig. 12).
CONNECT DECORATIVE FLUE
DUCTED INSTALLATION ONLY
Note: Rooms with 10 or 11 foot ceilings
require flue extension model AEIC34SB,
available from your local dealer. Discard
the upper flue supplied with the range
hood and replace it with the longer flue
extension.
1. Insert the upper flue and lower flue in the
support frame (Fig.13).
2. Mount the hood to the ceiling using the (4)
previously installed 6x60mm screws.
Tighten these screws. Install (2) additional
6x60mm screws
illustration. Make sure all (6) screws are
secure.
3. Use 8" round metal duct to connect the
duct collar on the hood to the ductwork
above (Fig.14).
4. Use duct tape to make all joints secure and
air tight.
as shown in the
INSTALL (16) 3.9 x 9.5 mm SCREWS &
LOCK WASHERS ON (8) SCREWS
- 12 -
FIG.12
FIG.13
10-INCH DIA.
METAL DUCT
FIG.14