Zephyr Essentials Roma Island ZRM-E36BS Guide D'utilisation, D'entretien Et D'installation page 11

Masquer les pouces Voir aussi pour Roma Island ZRM-E36BS:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

!
CAUTION: At least two installers are
required due to the weight and size of the
hood.
Ceiling Joists
Wood Blocking
Top Support Frame
Support Frame Arm
Bottom Support Frame
Blower Housing
Hood Body
FIG. A
1. Determine mounting location on ceiling and temporarily tape paper template (included with hood) to ceiling.
Cut out internal shaded area of template to allow ducting and electrical to pass through. If necessary, add
wood blocking (min. 2" x 4") to ceiling joists located behind the drywall to reinforce the mounting location*.
(FIG. A1) Secure (2) M6 x 1" wood screws to points A and B of the paper template. (FIG. B) Do not
completely tighten screws, leave approx. 1/4" exposed.
2. Remove screws securing top and bottom support frames together. Adjust support frame to accomodate the
desired hood height and re-assemble the frame using the previously removed screws (2 for each support
frame arm). (FIG. A3)
3. Lift support frame assemble up to the ceiling making sure the word "front" on the top support frame faces the
front of the hood where the controls will be located. (FIG. D) The key holes on the top support frame should
cover the wood screws previously installed in the ceiling. Slide support frame toward narrow end of key holes
to lock frame in place. Install the last (2) M6 x 1" wood screws with washers into the two remaining corners of
the top support frame to secure it to the ceiling. Tighten all screws.
4. Lift hood and align the (4) pre-installed mounting screws located on top of the Blower Housing (FIG. A4) with
the (4) key holes on the Bottom of Support Frame. (FIG. C) Slide hood towards the narrow end of key holes
to lock into place. Hand tighten each of the (4) screws with a screwdriver to secure hood to Bottom Support
Frame. Further secure bottom support frame to unit body by one M4 x 12 safety screw. (FIG. #, pg 10)
*Hood is intended to be mounted to a fi nished ceiling.
All manuals and user guides at all-guides.com
1
2
3
Bottom Support Frame
(secures to top of blower housing)
4
Mounting Screws
(pre-installed)
front - facing controls
9
FIG. B
Top Support Frame
back
Key Holes
FIG. C
FIG. D

Publicité

Table des Matières
loading

Table des Matières