Cable Management - Videotec UEBP4 Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 19
Use the screws and washers provided.
Apply thread-locker into the holes for
screws (Loctite 222®).
Pay attention to the fixing. Tightening
torque: 4.5Nm (±0.2Nm).
04
02
03
Fig. 2
Insert the O-ring supplied in the compartment
indicated in the figure (Fig. 3, page 3).
Fig. 3
MNVKUEBP4_2222_EN

6.2 Cable management

Connect the Ethernet cable supplied to the Ethernet
connector of the support.
Fig. 4
Remove the cable gland.
Fig. 5
Insert the cables in the cable glands of the base of
the PTZ camera.
Pass the Ethernet cable through the hole without
the cable gland.
Fig. 6
The Ethernet cable provided must not be cut.
Once the cables are inserted, it is not necessary to
tighten the cable glands.
3

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Uebp7

Table des Matières