Before Installation - Toto CST436 Manuel D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

„ Read these instructions thoroughly before beginning work.
„ Please leave instructions for customers. These instructions contain
maintenance and warranty information.
„ If necessary, remove the existing toilet and if new construction, purge the
supply line.
NOTICE
Due to the powerful performance of our Tornado, G-Max, E-Max and Power
Gravity flushing systems, they are not specified for back-to-back installations.
The only means of installing these toilets in a back-to-back situation is when
the toilet drain connections incorporate a WYE fitting. Please contact your
builder or contractor prior to this installation.
Double Combination WYE / 1/8 Bend
Water supply shut-off valve installation recommendations
Follow these recommendations to ensure an optimal and trouble-free
installation with a neat and professional appearance.
Location
(From floor and left of
center of floor flange)
Valve type
Maximum length

BEFORE INSTALLATION

YES
4-3/4" x 4-3/4" (120mm x 120mm)
Angle stop type valve with supply connection
facing upward, inward, or downward
NOTE: Straight stop type valve, or valve with
supply connection on front of angle stop, is not
recommended
Angle stop must not protrude more than 3-1/2"
(90mm) from wall
Centerline of
Flange
Double Sanitary Tee / Sanitary Cross
Centerline of
Stop valve
4¾"
(120mm)
"RI"
3
NO

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Cst448

Table des Matières