Olsberg INARA 2.0 Mode D'emploi Pour L'utilisateur page 62

Poêle à granulés
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation instructions
GB
for the specialist company
2.7 Installation
Installing the exhaust pipe
● Fit the pipe lining (on site) into the chimney!
The connection height can be determined individually, but
should not exceed 1.5 m from the connection.
● Make sure there is a distance of at least 95 mm between the flue
pipe and flammable elements!
● Plug the exhaust pipe (on site) into the pellet fireplace's Ø 80 mm
connection!
● Push the pellet fireplace into the intended place of installation
and adjust the pellet fireplace such that the exhaust pipe fits into
the pipe lining (see also the subsection: "Adjusting the pellet fire-
place with the height-adjustable feet")!
● The exhaust pipe connection must be sealed.
● Elbows with a cleaning opening must be used in order to be able
to clean the connecting line.
● The exhaust pipe may not protrude into the chimney.
Please note that a temperature of 85 °C can be reached at the parti-
tion walls in accordance with test specification EN 13240 and this
can result in colour changes in light wallpapers or similar flammable
building materials.
Fig. 2.14
Plug the exhaust pipe (on site) into the connection
Installing the balanced flue combustion air line (optional)
● Plug the Ø 80 mm combustion air line into the combustion air
nozzles (optional) if the combustion air should be supplied not
from the room in which it is installed but rather independently
from the room air via a line!
● Attach the Ø 80 mm combustion air line to either the rear or the
bottom of the pellet fireplace!
● Insulate the combustion air line with suitable insulating materi-
al because condensation can occur on the combustion air line in
very low outdoor temperatures!
● The combustion air line may not be connected during operation!
62
| 154
Fig. 2.15
Plug the Ø 80 mm combustion air line into the rear
Conversion of combustion air nozzles for connection from the
bottom
● Remove the lower back wall and panel!
● Unscrew the combustion air nozzles!
● Screw the combustion air nozzles onto the base plate.
● Install the panel and lower back wall again.
● Use the enclosed cover and screws to close the hold in the bot-
tom of the rear wall for the combustion air connection!
Fig. 2.16
Remove the lower back wall and panel
LEVANA 2.0 6 kW
LEVANA 2.0 8 kW
LEVANA AQUA 2.0
ARINA 2.0
INARA 2.0
3
11x
We reserve the right to make technical changes

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Levana 2.0Levana aqua 2.0Arina 2.0

Table des Matières