HoMedics UHE-OC1BK Mode D'emploi page 9

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5. Replace the tank cap by turning clockwise until tight. (Fig. 8)
Fig. 8
6. Install the tank straight down back on the base of the unit.
Make sure the tank is firmly seated. (Fig. 9)
Fig. 9
Fig. 10a
7. Place the oscillating nozzle back on the unit making sure
that the locator icons on the head and ring are aligned with
the locator icon ( ) on the base above the UNLOCK (
icon. (Fig. 10a)
Fig. 10b
8. Lock into place by turning the ring counter-clockwise until
the Locator icon ( ) is aligned with the LOCK (
(Fig. 10b)
NOTE: It is normal to have a small amount of water in the
base during and after use.
8
)
) position.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Uhe-oc1

Table des Matières