White&Brown MAMBO DB 716 Mode D'emploi page 27

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

All manuals and user guides at all-guides.com
notice_DB716
25/04/06
Before the first commissioning it is absolutely necessary to
assemble the feet.
For this operation, lay the ironing board and fix the feet to
the legs as shown in the side figures.
(to see figures A-B-C)
Fig. 1
• The steam complete ironing station must be placed on a firm
and solid surface and in a balance position.
• Take the ironing board with two hands in the right and left side
and place it in the correct position by means of the positioning
lever [10]: lift the lever [10] with a hand and lift completely the
board. When you hear the click noise the board is locked. The
steam ironing board can be adjustable at 6 different heights
(maximum height 100cm).
• Unroll the supply cable [1] of the ironing board.
Fig. 2
• Place the smoothing iron on the silicon rubbers [19] of the steam
station only.
• Place the hose holding antenna [25] on the steam station as
shown.
• Introduce the connecting flexible hose [18] into the supporting
antenna.
Pay attention to the supply cable [1] and the connecting
flexible hose [17] that must not get stuck or bend.
12:28
Page 27
COMMISSIONING
27

Publicité

Table des Matières
loading

Table des Matières