Installation Checklist - GE GeoSpring GEH50DNSRSA Manuel D'utilisation Et D'installation

Masquer les pouces Voir aussi pour GeoSpring GEH50DNSRSA:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION CHECKLIST

1.
Tank location:
– Is room size less than 10' x 10' x 7' (700 cu. ft.)/ 3m x 3m x 2.1m (19.8 m
(with 240 square inches (0.15 m
– Back of unit away from wall by 7 inches (17.8 cm), and sides have at least 3 inches (7.6 cm) clearance.
– Front of unit is free and clear.
– Is the water heater level? If no, add shims under the base of the unit.
2. Plumbing connections:
– Does not prevent air filter removal.
– No leaks after filling the tank with water, either when water is flowing or not.
3. Condensate lines are in place:
1) Short tube on upper drain nozzle.
2) Longer tube on lower drain nozzle and directed into a floor drain or a condensate pump.
4. Temperature and pressure-relief valve is working and drain line completed per local code.
5. Electrical connection does not prevent air filter removal.
6. Verify control panel displays 120°F (49°C) Hybrid mode. Assist user in how to adjust temperature (see "About Setting
the Water Temperature" section on page 5).
7. Front cover is in place.
WHAT TO EXPECT FOR "NORMAL STARTUP"
After the unit has been installed, with all electrical and water connections secure and checked, then the unit should be
filled with water (vent tank by opening a hot water faucet somewhere in home to allow tank to fully fill with water). Once
tank is full and power is energized, the user must press the POWER button on the user interface. The unit will then remind
the user to ensure tank has been filled, and to acknowledge by pressing POWER again.
Elapsed Time
HEWH Actions
0 to 1.5 minutes
Unit is silent
1.5 to 3 minutes
Fans turn on
3 to 8 minutes
Compressor turns on and runs for
5 minutes
8 to 30 minutes
Compressor turns off, and Upper
Element turns on for about
20 minutes
30 minutes and
Upper element turns off and com-
beyond
pressor turns back on
NOTE: The heat pump operating range is 45°F to 120°F (7°C to 49°C). If the ambient temperature is outside of this range,
the heat pump will turn off and the backup electric elements will be used until the ambient temperature returns to within
the operating range.
All manuals and user guides at all-guides.com
Installation Instructions
) of air-flow area) or similar ventilation is needed.
2
3
)? If yes, louvered door
Comments
This 3-minute off -time prevents compressor
damage.
This 5-minute period is used to ensure the tank is
full of water (Dry-fire prevention algorithm).
To quickly provide initial amount of hot water for
user (about 25 gallons/94.6 L).
Uses efficient heat pump for majority of heating
19

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Geospring geh50dxsrga

Table des Matières