INSTALLING ThE BASE
INSTALL ATION
INSTALLING ThE BASE
1
Item(s) needed:
a.
Review the mounting considerations at the
beginning of the installation and select a mounting
location. Make sure the downrigger is not
connected to a power source.
Make sure the downrigger is not connected to a power source.
b.
Take the Mounting Base (Assembly #C) and
attach it to the Downrigger Assembly (Assembly
#A). The Mounting Base is keyed with the bottom
of the Downrigger Assembly. The Soft Grip Knob
on the Mounting Base screws into a metal plate on
the bottom of the Downrigger Assembly. Secure the
Mounting Base to the Downrigger Assembly so that
the Soft Grip Knob is in the correct position.
c.
In the final Installation, the Mounting Base is
installed on the Swivel Base (Assembly #B). If
desired, hold the Downrigger Assembly (Assembly
#A) with the Swivel Base at the selected mounting
location to check fit and function. Use a second
person to help with the installation and test to make
sure that the downrigger will operate as desired.
d.
Determine if a mounting accessory, such as a
recommended deck plate is needed. Refer to
the installation instructions included with any
mounting accessory and then complete the
downrigger installation.
NOTICE: This downrigger weighs approximately
19 lbs. We recommend having a second person help
with the installation.
NOTICE: The Release Knob on the Swivel Base can
face any direction for your final installation.
8
#A x 1
WARNING
#C x 1
#B x 1
Downrigger
Downrigger
1a
Assembly
Assembly
Power Cable
Power Cable
1b
Downrigger
Downrigger
Assembly
Assembly
Metal
Metal
Plate
Plate
1b
1c
Release Knob
Release Knob
|
© 2021
Johnson Outdoors Marine Electronics, Inc.
Power
Power
Cable
Cable
Downrigger
Downrigger
Soft
Soft
Assembly
Assembly
Grip
Grip
Knob
Knob
Metal
Metal
Mounting Base
Mounting Base
Plate
Plate
Downrigger
Downrigger
Assembly
Assembly
Mounting Base
Mounting Base
Swivel Base
Swivel Base
Mounting
Mounting
Location
Location
|
cannondownriggers.com