Step 4:
4a:
Remove the two hold down bolts securing the beam to the crate base .
4b:
Slide the beam down so that the foot plate hangs over the edge of the crate base .
4c:
Using two people or a suitable lifting device, stand the beam assembly up on end as
shown, making sure that the beam is on a stable and level surface .
CAUTION: Have a person stabilize the beam until
it is secured to the tank/tongue assembly .
4d:
Locate the pivot pin and r-clip from the hardware kit .
4e:
Roll the tank/tongue assembly into position, aligning the pivot tube located on
the tank assembly with the holes located on the two tabs that are on the beam .
4f:
Slide the pivot pin through both the holes and fasten with the R-clip .
4g: Engage the beam vertical lock located near the pivot tube on the tank assembly .
4h: With the beam in vertical position, locate the beam to tongue lock
(2) M12 x 25 SHCS, (2) M12 flat washers, and (2) M12 lock washers
from the hardware kit .
4i:
Place the beam lock into position and align the holes .
4j:
Fasten the beam lock in place using the provided hex wrench and hardware .
4k: Lower the beam into horizontal position and verify the beam locks
onto the tongue .
1
5
7
8
3
Item Description
1
Tank and Tongue Assembly
2
Beam Assembly
3
Pin
4
R-clip
6
5
Beam Lock
6
M12 x 25 Screw
7
Flat Washer
8
Lock Washer
4
2
Assembly Instructions
5
7
4f:
3
4j:
5
7
Quantity
3
19
8
6
4
8
6
4
1
1
1
1
1
2
2
2