2) The frame must be fixed by bolts (M10) to concrete foundation or brackets. The
concrete foundation must be solid and fastened; the bracket must be strong enough
antirust treated;
3) Please don't stack substances that will block air flow near inlet or outlet area, and
there is no barrier within 50cm behind the main machine, or the efficiency of the
heater will be reduced or even stopped;
4) The machine needs an appended pump (Supplied by the user). The recommended
pump specification-flux: refer to Technical Parameter, Max. lift ≥10m;
5) When the machine is running, there will be condensation water discharged from the
bottom, please pay attention to it. Please hold the drainage nozzle (accessory) into
the hole and clip it well, and then connect a pipe to drain the condensation water
out.
C.Wiring
1)
Connect to appropriate power supply, the voltage should comply with the rated
voltage of the products.
2)
Earth the machine well.
3)
Wiring must be handled by a professional technician according to the circuit diagram.
4)
Set leakage protector according to the local code for wiring (leakage operating
current ≤ 30mA).
5)
The layout of power cable and signal cable should be orderly and not affecting each
other.
D.Switch on after finishing all wiring construction and re-checking.