2. TRANSPORT AND INSTALLATION.
2.1. TRANSPORT AND PACKAGING
Knocks and sudden movements must be avoided when transporting the equipment. In any case, the packaging
must be protected from water.
HANDLE THE EQUIPMENT CAREFULLY, IT WILL LAST LONGER !
2.2. ELECTRICAL SUPPLY INSTALLATION.
The electrical installation of the equipment making up the system must be carried out by specialised personnel
according to the applicable standards.
The location must fulfill the following conditions:
Place: Dry and ventilated. Far enough away from the welding area in order to prevent the dust caused by
-
the welding process from getting into the equipment. Never work in the rain.
The distribution panel where the machine has to be connected must have the following elements, at least:
-
CABLE PLUG
"SCHUKO"
2P + T 16A
CABLE PLUG
"CETAC"
2P + T 32A
The connection to the mains is made by the input hose. IMPORTANT! Verify that the wire is connected to a plug
with an efficient earth tap.
If you have special equipment, with power supply voltage other than 230 V, you will find the data for defining the
necessary electrical installation on the equipment characteristics plate.
Any supply voltage that is outside the rated margin gives rise to the activation of the protection system, preventing
the welding operation.
Length
5 m
Up to 150m
> 15 m Up to 50 m
All manuals and user guides at all-guides.com
SMART 200 MP
SOCKET AND ELECTRICAL PROTECTION DEVICES
SOCKET AND ELECTRICAL PROTECTION DEVICES
SMART 200 MP
CROSS-SECTION
2
4 mm
2
4 mm
2
6 mm
SOCKET
MAGNETOTHERMAL
SWITCH
DIFFERENTIAL
CIRCUIT-BREAKER
SOCKET
MAGNETOTHERMAL
SWITCH
DIFFERENTIAL
CIRCUIT-BREAKER
If it is necessary to use a longer power supply hose or a
connection to an extension, keep in mind the values of this
table. These values are for reference and are influenced by the
state of the conductors, connections and ambient temperature.
16
2P 16A + TT
2P 16A-(230V)
2P 25A / 300 mA
2P 32A + TT
2P 25A-(230V)
2P 25A / 300 mA