2-22. NEOLIUM LINE 400 and 600 10.00m platform assembly
• Closely follow the whole of §2-10 to assemble the NEOLIUM 200/250 and 300 10m platform.
• Assemble the platform without a hatch at the same level as the platform with a hatch.
2-23. NEOLIUM LINE 400 and 600 11.00m platform assembly
• Closely follow the whole of §2-11 to assemble the NEOLIUM 200/250 and 300 11m platform.
• Assemble the platform without a hatch at the same level as the platform with a hatch.
106-A000035565 - ind.D - 11/2021
84