2-8. NEOLIUM LINE 200/250 and 300 8.00 platform assembly
• Closely follow the whole of §2-6 to assemble the NEOLIUM 200/250 and 300 6m platform.
• For the 8m platform and above, the stabiliser + extension set replaces the standard stabilisers.
• Assemble the 2 x 2.00m extensions by following § 2-1-5.
• Mount the platform with the hatch on rung no. 31 by following § 2-1-6.
• Mount the 4 braces on rungs no. 33, and then no. 35, by following § 2-1-8.
• Position the toeboards by following § 2-1-8.
Collar clamp position:
nd
Between the 2
and 3
th
th
and the 14
and 15
106-A000035565 - ind.D - 11/2021
rd
rungs,
rungs
70