2-11. NEOLIUM LINE 200/250 and 300 11.00m platform assembly
• Closely follow the whole of chapter 2-9 to assemble the NEOLIUM 200/250 and 300 9m platform.
• Assemble the 2 x 2.00m extensions by following § 2-1-5.
• Mount the platform with the hatch on rung no. 43 by following § 2-1-6.
• Mount the 4 braces on rungs no. 45, and then no. 47, by following § 2-1-7.
• Position the toeboards by following § 2-1-8.
106-A000035565 - ind.D - 11/2021
77