Télécharger Imprimer la page

Fleurco B005 Guide D'installation page 8

Publicité

5A
5B
6B
ÉTAPES D'INSTALLATION DE LA PORTE / DOOR INSTALLATION STEPS
- RÉALIGNEZ LE JAMBAGE
À LA LIGNE DE REPÈRE. (2)
- MARQUEZ LES POINTS DE REPÈRE DE PERÇAGE
SUIVANT LES AVANT-TROUS.
Étape / Step
- PERCEZ LES TROUS EN UTILISANT UNE MÈCHE
APPROPRIÉE (1/4").
5
- REALIGN WALL JAMB WITH REFERENCE LINE (2).
- MARK DRILLING LOCATION FOLLOWING PILOT HOLES.
- DRILL HOLES BY USING SUITABLE 1/4" DRILL BIT.
6A
Étape / Step
- INSÉREZ LES CHEVILLES
ET METTEZ-Y UNE GOUTTE DE SILICONE.
- FIXEZ LES JAMBAGES AVEC LES
6
- INSERT THE WALL PLUGS (6)
AND PUT IN EACH A DROP OF SILICONE.
- SECURE THE WALL JAMB USING 1 3/8" SCREWS (6)
SUR LES DEUX CÔTÉS
ON BOTH SIDE
(6)
VIS 1 3/8" LG (6).
PAGE 5

Publicité

loading