Installation and Operating Instructions
ATTENTION
Temperature Control System WHS HE
2.4
Dimensions
2.5
Electrical connection / commissioning
The safety instructions in chapter 1.2 must be observed!
– The electrical connection and commissioning are to be carried out in accordance with the relevant wiring diagram
and are only to be carried out by a certified electrician.
– All relevant standards, safety regulations (e.g. DIN VDE 0100), as well as the technical connection conditions of
energy suppliers are to be adhered to!
– Network configuration, voltage and frequency must be consistent with the rating plate information.
– Protective conductor, including additional potential equalisation connections must be properly installed!
– Check designated use of the assembly
– Compare mains voltage to rating plate data
– Check all parts for tightness, particularly fittings, water connections and pipes.
– Compare power consumption to rating plate data
230
100
G1
G1
7
G1
G1
UK
Fig.10