Télécharger Imprimer la page

Blue Lagoon AOP Compact Ozone UVC 75 Manuel page 6

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 15
AOP COMPAC T OZONE & UV-C 75W
AOP COMPAC T OZONE & UV-C 75W SALT WATER
EN
INSTALLATION OF THE EARTH (DRAWING 2)
1. Pull the cable (2) through the strain relief (4) before fitting the synthetic strain relief (4) onto the earth
bolt (1). Position the strain relief (4) at approximately 10 cm from the eye (2) of the earth cable.
2. Place the eye (2) of the cable onto the earth bolt that is fitted to the housing.
3. Then place a toothed lock washer (3).
4. Fit the strain relief (4), creating a loop of Ø 5 cm.
5. Finally place the second toothed lock washer (5) and the lock nut (6) onto the earth bolt.
6. Once the parts have been placed onto the earth bolt in the correct sequence, they can be
tightened with a spanner or a ring spanner number 8.
INSTALLATION OF THE DEVICE (SEE DRAWING 3)
Determine where the device will be installed. The Blue Lagoon AOP Compact Ozone & UV-C 75W
must never be installed behind the Ph regulator or the salt electrolysis system in your swimming
pool installation. The ideal location to install your device is immediately behind the filter. The
installation must always take place outside of the pool. Ensure that there is always water flowing
through the unit when the lamp is on. Never install the unit in an area exposed to full sunlight.
The installation must always take place in a dry and well-ventilated area. The device must always
be fitted in the vertical position, and a space of 30 cm must be available underneath to carry out
maintenance. An area of approx. 1.5 m must be available at the top in order to be able to replace the
lamp (Q) smoothly without having to dismantle the complete device.
1. Fit the manometer (I) onto the Venturi system using Teflon tape (not included in the delivery).
Hand-tighten the manometer.
2. Glue the entire Venturi system (K) onto the inlet (N) of the device using the supplied Ø 63-50 mm
glued socket (L). The Venturi system must be mounted onto the device in a horizontal position.
The glued socket (L) has a screw thread on one side; when gluing the glued socket, ensure that
the screw thread is inserted into the inlet (N).
3. Take the hose with the non-return valve (M). Fit the short section of the hose to the bottom
side of the device on the hose (P). Place the long section of the hose onto the adapter (Z) of the
Venturi system.
4. Then mount the complete device, including the Venturi system, at the desired place between the piping.
5. Fit the unit with the supplied pipe clips (O) in a fixed position and hand-tighten the 3-part
couplings (S). Never use a wrench, tongs or other tools to tighten synthetic parts.
6. Activate the pump and check that there is flow and no leakage in the system.
7. Insert the plug of the UV-C device into a wall socket with a safety ground. Check whether the
lamp (Q) is operating via the transparent outlet (R) of the unit.
8. The quantity of ozone air in the system can be adjusted using the ball valve (J). The closer the
ball valve is positioned, the more ozone air will enter the system. The ideal position on the
manometer is between 0.4 and 0.7 bar.
| BLUE LAGOON AOP COMPACT OZONE & UV-C 75W & AOP COMPACT OZONE & UV-C 75W SALTWATER
6
Important read this manual carefully before proceeding
to installation and commissioning.

Publicité

loading

Ce manuel est également adapté pour:

Aop compact ozone uvc 75 saltwater