Télécharger Imprimer la page

Kobe Range Hoods CH9130SQB-1 Manuel D'installation Et Mode D'emploi page 14

Publicité

Les langues disponibles

Les langues disponibles

4. For Rear 3-1/4" x 10" vent installation only:
-
Remove attached 6" exhaust and discard.
(Figure 11) Keep 13 screws to install vent
covers.
-
Remove duct knockout from back of the hood
and discard. (Figure 13) Unscrew 3-1/4" x 10"
Vent Cover from rear exhaust (located inside
hood); keep screws to install 3-1/4" x 10"
Exhaust.
-
Align Top Vent Cover {E} and 3-1/4" x 10" Vent
Cover (removed from rear exhaust) using 14
screws (13 screws taken from 6" exhaust).
(Figure 13) Follow instructions in Step 5 to
attach Hood-Mounting Bracket {N} and two
Duct Cover Support {M} using 14 screws (13
screws taken from 6" exhaust). (Figure 15)
-
Attach the 3-1/4" x 10" Exhaust {D} to rear
exhaust (located inside hood) using 10 screws
taken from rear vent cover. (Figure 14)
Hood Installation
CAUTION
: If moving the cooking range is
necessary to install the hood, turn off the power in
an electric range at the
SHUT OFF THE GAS BEFORE MOVING A GAS
RANGE. And use a protective covering to protect
cooktop and/or countertop from damage.
5. Secure Hood-Mounting Bracket {N} and two Duct
Cover Support {M} on top of the hood with eight
pre-attached screws. Use four 3/16" x 3/8" screws
{K} for Hood-Mounting Bracket {N}. (Figure 15)
6. Using references on Table 2 and measurements
on page 18-20, mark the leveling point of the
hood. Position mounting screws (not provided) on
the wall, leaving 1/8" away from the wall as shown
in Figure 16.
7. Align Hood-Mounting Bracket {N} to the two
screws on the wall and hook hood into place.
Tighten screws to secure hood to the wall.
CAUTION
: MAKE SURE HOOD IS SECURE
BEFORE RELEASING
main
electrical
box.
Figure 13
Figure 14
Figure 15
Figure 16
11
Mounting Screws

Publicité

loading

Ce manuel est également adapté pour:

Ch9142sqb-1Ch9136sqb-1Ch9148sqb-1Ch7730sqb-1Ch7736sqb-1