Commissioning; Remote Control Operation (Ditronic) - S&P COR-PRO V W Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Purge the battery for proper operation and performance. Install shutoff valves in both pipes downstream of the unit. The
connecting thread just above the air curtain must be removable and not fi xed.
Pay attention to the cleanliness of the water circuit and, if the installation incorporates it, check the cleanli-
EN
ness of the upstream fi lter. Check the maximum temperature and pressure of the medium to avoid damage
to the water coil. Install shutoff valves (not included) in both pipes downstream of the unit. The connecting
thread just above the air curtain must be removable and not fi xed. Purge the battery for a correct operation
and performance.

10. COMMISSIONING

Before commissioning the unit, carry out following verifi cations:
• External casing integrity
• Ceiling or wall anchoring mounting
• Fixing fi lters and cleaning
• Correct connection and tightening of water pipes
• Correct water control valve installation (not included)
• Water pump operation (not included)
• Easy and direct access to inspection and maintenance door
• Supply voltage main presence
• Cables properly attached to their terminals
• Absence of mechanical objects or residues in inlet / outlet sides

11. REMOTE CONTROL OPERATION (Ditronic)

Remote control device is a touch screen type, for wall installation and it comes from factory with all
COR-PRO V W models as default (on demand, special SM version without remote control for air curtain unit
working as Slave). In addition, remote control packaging includes an Ambient/room temperature sensor that
can be installed on the wall voluntarily if working in automatic mode, this room sensor is selected instead of
discharge air temperature sensor (installed inside air curtain by default).
Remote control requires RJ45 cable between control device and air curtain (not included). The RJ45-10 COR-PRO ac-
cessory is offered as an option with a fi xed length of 10m. In case of Master-Slave connection between two air curtains,
cable required is RJ11 type (not included). The RJ 11-5 COR-PRO accessory is offered as an option with a fi xed distance
of 5m.
24
Bleed valve location after
suction grille removal

Publicité

Table des Matières
loading