Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation distances
Lower base
Electrical and hydraulic connection on the lower face of the vertical air curtain.
COR-PRO-V
Location according to variant "L" or "R"
L – Left installation

7. INSTALLATION

COR-PRO V W are air curtains designed for vertical operation connected to a hot
water supply from the bottom of the unit. In the lower part of the air curtain there is
a special structure so that it can be screwed to the ground. Access to this is possible
once the suction grille has been removed together with inspection door. To do this,
fi rst remove the suction grille and then the inspection door.
COR-PRO-VL
R – Right installation
EN
21

Publicité

Table des Matières
loading

Table des Matières