Télécharger Imprimer la page

Kohler K-15135 Mode D'emploi page 2

Publicité

Les langues disponibles

Les langues disponibles

Tools and Materials
Before You Begin
Observe all local plumbing and building codes.
Shut off the main water supply.
1. Prepare the Site
IMPORTANT! Secure the piping to the framing.
Install or relocate the water supplies as necessary.
NOTE: A typical bath and shower installation uses 1/2" copper
tubing and adapters.
Use thread sealant on all threaded connections.
Temporarily install 1/2" nipples to the bath and shower elbows,
extending at least 2" (51 mm) beyond the finished wall.
Turn on the water supply and check for leaks.
Complete the finished wall.
1011610-2-D
Plus:
• Emery Paper
Plumbers
Thread
Putty
Sealant
2
5/32"
Kohler Co.

Publicité

loading

Ce manuel est également adapté pour:

K-15136K-15137K-15138