Télécharger Imprimer la page

Harvia SOLIDE OUTDOOR 3 Instructions De Montage page 40

Sauna

Publicité

J6
T7
T1
Fix the floor coverings (J5-J10) with screws to the floor
beams and seal all corners with the included black sealant.
!
2. Terrace deck:
Cut clearances for the corner modules (G3-G4) to the
deck boards that are placed next to the sauna room
corners (V1-V7).
Place the terrace deck boards on top of the frame and distribute
them evenly, leaving approx. 5 mm gaps. Fix the boards to the
frame with 4,5 x 60 mm stainless steel screws.
Split the last board to suitable width with a saw and fix
to the frame with screws.
Fix the terrace fascia boards to the frame with screws.
40
J5
J9
J8
T3
T4
J10
J7
T3
J7
T2
Befestigen Sie die Bodenabdeckungen (J5–J10) mit
Schrauben auf den Bodenbalken, und dichten Sie alle
Ecken mit dem mitgelieferten schwarzen Dichtungsmittel
ab.
!
!
V1-V7
2. Terrassenboden:
Schneiden Sie Aussparungen für die Eckmodule (G3-
G4) der Terrassendielen, die an den Ecken (V1–V7) der
Saunakabine angebracht werden.
Legen Sie die Terrassendielen auf den Rahmen, und
ordnen Sie sie gleichmäßig an, mit Lücken von ca. 5 mm.
Befestigen Sie die Dielen mit Edelstahlschrauben von 4,5
x 60 mm am Rahmen.
Schneiden Sie die letzte Diele mit einer Säge auf die
passende Breite, und befestigen Sie sie mit Schrauben
am Rahmen.
Befestigen Sie die Blendleisten mit Schrauben am Rahmen.
J8
T5
T5
T9
T7
T8
T6

Publicité

loading