Installing the floors
1. Sauna room frame and floor:
Place the bottom logs on top of the foundation, according
to illustrations. Glue the bottom logs' vertical joints with
the included light adhesive and use 5 x 120 mm screws
to secure the logs. NB! Check cross-measure, X=Y!
Attach the bottom log layer to the concrete blocks with
steel corner brackets.
Use the included light adhesive to glue a support strip
board (32 mm x 48 mm, pressure treated wood) along
the bottom of the front and back wall logs (A1 and B1).
Secure with 4,5 x 60 mm screws.
Place the floor beams according to the foundation diagrams
in the beginning of this manual. Note approximate
distances for the beams (A=A, B=B, C=C...). Screw
the floor beams in place from outside the frame.
Place the sauna room drain chute (J11) on top of the floor
beams and through the outer wall. Lift the floor coverings
in place.
D1.
D1
38
Montieren der Böden
1. Rahmen und Boden der Saunakabine:
Setzen Sie die unteren Bohlen auf das Fundament, wie in
den Abbildungen gezeigt. Tragen Sie den mitgelieferten
hellen Kleber auf die Endkanten der unteren Bohlen
auf, und schrauben Sie diese mit den Schrauben von 5
x 120 mm fest. ACHTUNG! Stellen Sie sicher, das die
Diagonalen das gleiche Maß aufweisen, X=Y!
Befestigen Sie die untere Bohle mit Stahl-Eckwinkeln an
den Betonblöcken.
Kleben Sie mit dem mitgelieferten hellen Kleber eine
Trägerleiste (32 mm x 48 mm, druckimprägniertes
Holz) an die Front- und Rückwandbohlen (A1 und B1).
Befestigen Sie sie mit Schrauben von 4,5 x 60 mm.
Platzieren
Fundamentzeichnungen am Anfang dieses Handbuchs.
Beachten Sie die ungefähren Abstände der Balken (A=A,
B=B, C=C, ...). Schrauben Sie die Bodenbalken von der
Außenseite des Rahmens fest.
Platzieren Sie die Ablaufrinne (J11) der Saunakabine auf
den Bodenbalken und über die Außenwand. Legen Sie die
Bodenabdeckungen auf die vorgesehenen Positionen.
A1
A1
Sie
die
Bodenbalken
gemäß
den