5.7
Basic filling
The pump of the product must not exceed the pump capacity of 100 l/h.
Verify that the intake air is dried by means of a sufficiently large drying fil-
ter.
1. Fill the interstitial space to obtain a pressure of approx. 500 mbar (stand-
ard version).
- Use an installation pump with a greater capacity for this purpose.
2. Once a pressure of 500 mbar (standard version) has been built up, dis-
connect the installation pump.
3. Connect the product.
5.8
Drying filter
Drying filters must be mounted in the suction line in order to dry the intake air.
The drying filters are not included.
Depending on the ambient conditions, the drying beads in the filter are sub-
ject to wear since they absorb humidity. Wear of the drying beads is indicated
by a change in the colour from orange to colourless.
The drying beads in the filter must be replaced after one year or when the col-
our of the drying beads changes.
Mounting
Europress
EN
32