8.3
Maintenance activities
ELECTRIC SHOCK CAUSED BY LIVE PARTS
•
Disconnect the mains voltage supply before performing the work and ensure
that it cannot be switched on.
Failure to follow these instructions will result in death or serious injury.
Replacing the relay fuse F1
Verify that the mains voltage is interrupted and cannot be switched on.
1. Open the upper part of the housing.
2. Remove the flat cable from the connector.
3. Remove the transparent cover from the relay fuse F1.
4. Fit a new relay fuse F1 (T 2 A).
5. Refit the transparent cover.
6. Connect the flat cable to the connector.
7. Fit the upper part of the housing and close it.
8. Apply mains voltage.
8.3.1
Reconditioning the drying beads
Used drying beads are colourless.
1. Replace the drying beads in the filter.
2. Close the drying filter after replacing the drying beads.
Unused drying beads must be stored in a tightly closed container.
Maintenance
DANGER
Europress
EN
44