6.2.2 Scope of delivery

Serial accessories:
• Balance
• Weighing plate
• Mains power supply
• 2 conveyor screws
• Protective cover
• Operating Manual

6.2.3 Basic structure

• Place the balance on a horizontal and solid base.
• Remove the transport security on the 4-point support.
• Pull off the protection foil from the weighing plate if existing.
• Attach the weighing plate.

6.3 Mains connection

Power is supplied via the external mains adapter. The stated voltage value must be
the same as the local voltage.
Only use original KERN mains adapters. Using other makes requires consent by
KERN.

6.4 Operation using a (rechargeable) battery (optional)

Lift-off the battery cover on the lower side of the balance. Connect 9 V compound
battery.
Reinsert the battery cover.
For battery operation the balance has an automatic switch-off function. (after 3
minutes).
If there exists an optional rechargeable battery, it has to be connected in the battery
compartment via a separate plug-in socket. Now the mains adapter delivered with
the rechargeable battery must be applied.

6.5 Initial Commissioning

In order to obtain exact results with the electronic balances, your balance must have
reached the operating temperature (see warming up time chap. 1). During this
warming up time the balance must be connected to the power supply (mains,
accumulator or battery).
The accuracy of the balance depends on the local acceleration of gravity.
Strictly observe hints in chapter Adjustment.