INSTALLATION: COMPONENT ASSEMBLY AND CONNECTION

––– STEP 5 –––

5.1 - INSTALLING CL2SL CONTROL UNIT

01. Select the installation position in an area protected against potential
impact and in the vicinity of the gate, to reduce the overall length of
the cables;
02. Remove the cover by prying with a screwdriver on the opening at the
bottom; slide it a few centimetres and then lift it up from the bottom
(fig. 3);
03. Lay the duct for routing the electric cables so that they can be insert-
ed from the lower section of the control unit;
04. Drill a hole in the bottom of the control unit and use suitable fitting to
affix the cable passage ducts, as shown in fig. 4;
05. Breach the two holes at the bottom with a screwdriver; mark the drill-
ing points using the bottom as reference (fig. 5);
06. Use a percussion drill to drill the wall, with a 6 mm tip, and insert 6
mm plugs;
07. Secure the bottom with the relative screws [A];
08. Before closing the control unit, make the electrical connections, refer-
ring to paragraph 5.6 and to fig. 6;
09. To close the control unit, position the bottom cover approximately 3
cm higher than its final position, and push it downwards until it is fully
attached, as shown in fig. 8.
5.2 - INSTALL AND CONNECT PH100 PHOTOCELLS (fig. 9)
Warning: disconnect the power supply to the system before performing
any installation operations; if the system is equipped with a PR1 buffer
battery, the latter must be disconnected.
Warnings: Be careful not to damage the o-ring (fig. 9-3) [A].
Select the position of the two elements making up the photocell (TX and
RX) observing the following:
• Place them at a height of 40-60 cm above ground, at the sides of the
area to be protected, and as close as possible to the gate wire, no fur-
ther than 15 cm.
• Ducting for passage of the cables must be provided at the intended
point.
• Point the TX transmitter towards the RX receiver, with a maximum mis-
alignment of 5°.
01. Remove the front glass (fig. 9-1).
02. Position the photocell at the point where the cable passage ducting
starts.
03. Trace the drilling points using the base as a reference. Use a percus-
sion drill to drill the wall, with a 5 mm bit, and insert 5 mm plugs.
04. Pass the electrical cables through holes (made as desired): see the
two options in fig. 9-2.
05. Secure the bottom with the relative screws [B] in fig. 9-3 doing so in
such a way that the hole on the bottom [C] in fig. 9-3 corresponds to
the cables output. 2 self-tapping screws are also supplied for fixture
on surfaces with a different density.
06. Connect the electric cable to the correct terminals, TX and RX
(fig.  9-4). TX and RX are connected in parallel to one another
(fig.  9-5) and to the blue terminal on the control card. You do not
need to observe any polarity.
07. Affix the housing cover [D] in fig. 9-6 with the two screws [E] in
fig. 9-6 and a Phillips screwdriver. Finally insert the outer cover [F] in
fig. 9-6 closing it with slight pressure.
5.3 - INSTALL AND CONNECT FL100 FLASHING INDICA-
TOR (fig. 10)
Choose the location of the flashing indicator, so that it is in the vicinity of
the gate and easily visible. This may be secured to a horizontal or vertical
surface; fig. 10 shows the two situations:
01. Remove the cover, unscrewing the screw if present.
02. Separate the base, unscrewing the screws present to route the elec-
tric cables.
03. Mark the drilling points using the bottom as a reference, and doing
it so that the hole at the bottom corresponds to the cables output:
vertical fixing (A) or horizontal fixing (B).
04. Use a percussion drill to drill the wall, with a 6 mm bit, and insert 6
mm plugs.
05. Fix the base, using the relative screws.
06. Connect the electric cables in the relative FLASH and "aerial" termi-
nals as shown in the figure: To facilitate operations, remove terminals,
make connections, then refit the terminals.
No polarity needs to be observed on the FLASH terminal, while in the
case of the shielded cable connection of the aerial, the sheath must
be connected.
07. Insert the lamp holder in the base, taking care to press it down so
that it locks into place;
08. Secure the body of the flashing light to the fixing support and turn it
left until it clicks into place, then secure by means of the screw.
5.4 - ELECTRICAL CONNECTION TO CONTROL UNIT
CL2SL
To make the electrical connection, at very low voltage, of the various
devices, refer to fig. 6.
01. To connect the gearmotors: remove the gearmotor cover as
shown in fig. 3.
02. Loosen the cable clamp located below the gearmotor, route through
the electric cable, then tighten the cable clamp fully down (fig. 4).
03. Make the electrical connections observing the colour coding shown
in fig. 6.
04. Close the cover of the gearmotor.
At this point, make the electrical connections of the various devic-
es (see the paragraphs of the various accessories):
• The terminals have the same colour as the terminals on the correspond-
ing devices; for example the grey terminal (OPEN) of the KS100 key-oper-
ated selector switch must be connected to the grey terminal (OPEN) of
the control unit;
• No polarity is needed for virtually any of the connections; only in the
case of the shielded cable of the aerial, the central core and sheath must
be connected as shown in detail [A] di fig. 6.
Notes - To facilitate the hookup, you can remove the terminals as shown
in fig. 7 -[A]; insert the wires and then restore them to their original posi-
tions. Once the connections are complete, use cable ties to secure the
electrical cables to the appropriate fixtures [B] (fig. 7).