Connection Diagram - BADU OmniTronic Traduction Du Instruction D'utilisation Originale

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 102
Installation
5.3.3

Connection diagram

Fig. 6
To connect the cables, first pull the plug off the pin header
upwards. The wires with press-fit wire end ferrules can therefore
be inserted conveniently under the orange opening points without
tools.
34 EN
04|2019

Publicité

Table des Matières
loading

Table des Matières