S19-310AC
Assembly of Components
11
12
13
14
NOTE: Use
teflon tape
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY
http://www.bradleycorp.com
Items 10.1–10.5 come preassembled as Item 10.
Items 24 and 25 come preassembled.
4
8
10
9
10.3
10.4
10.5
10.2
10.31
only.
15
27
R
P.O. Box 309, Menomonee Falls, WI 53051
TEST THIS UNIT EACH WEEK
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
Date
Signed
Date
Signed
Datum
Unterschrift
Date
Signed
Date
Signe
Date
Signed
FAX: (262-251-5817)
114-052
28
7/18/2017
Optional 1-1/4" NPT Supply
Inlet (best for rigid support)
7
3
25
24.5
24.4
24
24.2
24.1
17
23
19
22
26.3
26
26.1
26.5
Bradley • 215-163AC Rev. C; ECN 17-05-039
If tee (Item 7) is used as a supply inlet,
use plug (Item 8) on tee (Item 2)
1¼" NPT
2
Supply Inlet
25.3
25.2
25.1
6
24.3
5
20
20
20 18
21.1
21.4
4
2
26.2
3
26.4
2
1¼" NPT
Drain Outlet
1
26.6
Installation
17
21
21.2
21.3
21.11
26.3