3. INSTALLATION AND CONNECTION
3.1 Installation illustration
Installation items
The factory only provides the main unit and the water unit ; the other items iillustrated in the
diagram are system parts and are provided by the user or installer.
ATTENTION
Use the following procedure during initial start up.
1.
Open valve and fill with water.
2.
Make sure that the pump and the water
IN PIPE HAVE BEEN lLLED WITH WATEr.
3.
Close the valve and start the unit.
ATTENTION : It is necessary that the water-in pipe is higher than the pool surface.
The schematic diagram is for reference only. Please check the water inlet/outlet label on the heat
pump while plumbing installation.
Chlorinator cell
Water inlet
Sand filter
(or other type filter)
Water outlet
Pool
Water pump
Valve
Water supply
5