6
Installation
6.1
Installation diagramm
3
Depending on its size, the unit is either mounted vertically on the wall
with the enclosed mounting accessories or stands upright on the floor
(horizontal mounting is possible after consulting our specialist advice).
Depending on the nominal connection diameter, the water connections
are made with threaded unions or with flange connections.
● Mount the control unit "UV Control II" (4) and the ballast unit (3) on
the wall.
● Ground the Bewades unit with the enclosed ground cable (connect
to the threaded pin welded to the top of the unit).
Bei 80W80/11 EU und 100W100/11 EU:
Welded grub screw on the upper side of the system.
Bei Bewades 240W und 320W;
Screw in the middle of the container cover.
Also connect a potential equalization cable to the bow in the upper half
of the irradiation chamber.
13
1
2
14
18
17
4
15
16
DANGER!
Risk of injury!
The emitter protection tube is forced up-
wards by the water pressure.
►Never pressurize unit unless the upper emitter
protection tube lock (9) is in place.
►For safety reasons, the UV emitters may only
be started in the UV disinfection unit when the
blue protective cap is in place.
EN
18
25