Periodic Maintenance - ENAR TORNADO Serie Manuel D'instructions

Regles vibro aplanissantes à moteur électrique ou essence
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

LINE SECTION IN mm
25
16
10
6
4
2,5
1,5
0
1000
NOMINAL CURRENT x LINE LENGTH (A m)

6.2 PERIODIC MAINTENANCE

MAINTENANCE WITH PETROL ENGINE
2.-
3.-
4.-
5.-
6.-
7.-
en
8.-
9.-
MAINTENANCE WITH ELECTRIC MOTOR
1.-
2.-
3.-
4.-
5.-
6.-
7.-
8.-
9.-
10.- Every 12 months or more frequently the screed has to be sent to an authorized workshop for
Re-screw the nuts and bolts daily.
8
2
115 V
230 V
2000
3000
4000
5000
1.-
Clean the engine and the beams, check the bolts & nuts, check and fill the engine reservoir
with oil.
Weekly (50 hours).
Change the motor oil (first 20 hours), clean the sparking plugs and the air filter.
Monthly (200 hours).
Clean the oil filter, clean and adjust the sparks plugs.
Every 250 hours. Clean and set the carburettor, clean the cylinder's head, set the valves.
Always use original parts by every maintenance operation.
The safety fittings have to be checked after every maintenance.
Every 12 months or more frequently, the screed has to be sent to an authorized workshop for
service according to the intensity of the usage.
Do not fill the fuel tank while smoking or near any other potential source of danger.
Lock the petrol admission key when filling, use unleaded gas, clean the gas spelt.
Idle speed of the motor must not exceed 3.000 rpm. (standard set).
By every maintenance operation, the idle speed of the engine has to be checked and adjusted
at 3.000 rpm.
See the engine manual to set the engine speed, starting and stopping.
The operating of the electric parts must be done by a specialist.
During the maintenance, make sure that the device is disconnected from the power source.
Always use original parts by every maintenance operation.
The bearings of the motor do not need a periodic maintenance.
Inspect the plug, the socket as well as the cables every 100 hours.
Clean periodically the housing of the motor to prevent an overheating. Don't wash the
TORNADO E TURBO motor with a high pressure water hose.
Clean weekly the TORNADO E TURBO air inlet filter (or when 50 hours working) removing
the screws of the housing cover 48402.
On screeds TORNADO E TURBO check periodically the condition of the brushes and replace
them when 120 hours working (brush code 103656).
The safety fittings have to be checked after every maintenance.
service according to the intensity of the usage.
Minimun sections according to VDE standars
Section (mm
380 V
1
1,5
2,5
4
6
10
16
25
6000
ELECTRIC AND PETROL VIBRATING SCREEDS "TORNADO" TYPE
2
Max. load (A)
Max. fuse. (A)
)
15
18
26
34
44
61
82
108
10
10/3-16/1-
20
25
35
50
63
80

Publicité

Table des Matières
loading

Table des Matières