Télécharger Imprimer la page

Kinedo AQUAFACTORY Utilisation Et Installation page 19

Colonne de douche
Masquer les pouces Voir aussi pour AQUAFACTORY:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 24
F
TECHNICAL DATA
1
Voltage...................................................................................... Volt
Frequency ...................................................................................Hz
Absorbed power ..................................................................... kw
Maximum current ...................................................................... A
Hot and cold water coupling
Power cord ......................................................................................
Mains pressure (atm) ........................................................... atm 2,5-5,0
Water flow rate ..................................................................lt/min
Dynamic pressure ...................................................................bar
Cold water temperature .........................................................°C
Hot water temperature ...........................................................°C 50÷80
Column net weight ................................................................. kg
(2) for higher pressures, install a pressure reducer upstream of the pipes.
Perform installation and assembly following the instructions
and sequence shown at
F
SIZE
2
L ................................................................................................... cm.
N .................................................................................................. cm. min. 200
T .................................................................................................. cm.
Z .................................................................................................. cm.
C - Hot water connection for 1/2" taps
F - Cold water connection for 1/2" taps
K - Area for flexible hoses couplings
Installation must occur once the floor and walls are finished.
TECHNICAL DATA
(1) two flexible hoses are required.
(3) to ensure correct operation, water temperature must be 50°C.
page 66.
...............................................
(1)
19
EN
--
--
--
--
1/2"
--
(2)
8÷13
2
5÷25
(3)
5
90÷110
75
15

Publicité

loading