STEP # 3
STEP #3
- Install the rough in the exact depth (1-7/8"). It is recommended to fit the support (10) in the back of the rough and
secure it the 4 screws supplied (11).
- Install the rough in the exact depth ( 1 7/8") . It's recommended to fi t the sup-
port (10) in the back of the rough and secure it the 4 screws supplied (11)
- Connect the mixed water to inlet #1 waterfall and inlet #2 rain (Please consult the suggested shower layout).
- Connect the mixed water to inlets #1 (cascading chute) and inlet #2 (rain). (Please consult
- Install the gyproc and tile with the exact cutting hole size recommended.
The suggested shower layout )
- Install the gyproc and tile with the exact cutting hole size recommended
ETAPE # 3
ÉTAPE #3
- Installer le brut de plomberie dans le mur 2x4 avec une profondeur d'encastrement d'exactement 1-7/8". Il est
important de fixer un support arrière (plywood) , ensuite fixer le brut avec 4 vis fournis (11).
- Installer le brut dans le mur 2x4 avec un profondeur d'ecastrement exactement
1 7/8". Il est important de fixer un support arrière (plywood), ensuite fixer le brut
- Connecter le mélangeur d'eau à l'entrée #1 chute d'eau et à l'entrée #2 pluie (Consulter le guide de montage de
avec 4 vis fournis (11).
douche).
- Connecter de l'eau mélangée aux entreée #1 (chute d'eau) et #2 (pluie).
- Installer le gypse et la tuile avec le trou de percage exactement comme indiqué.
(Consulter le guide de montage de douche).
- Installer le gypse et la tuile avec le trou de perçage exactement comme indiqué.
2X4 WALL
1 7/8"
last revision: 03/27/2017
SUPPORT
10
#1
1/2 N.P.T.
11
5 5/8"
aquasheet 2872
3 1/2"
#2
1/2 N.P.T.
4 7/16"
CUTTING HOLE SIZE
5
Wallmount dual function rainhead
Tête de pluie murale à 2 fonctions
1" MAX.
FINISHED WALL
GYPROC + TILE
aquabrass.com