Télécharger Imprimer la page

Slackers NINJAROPE Mode D'emploi page 4

Publicité

Les langues disponibles

Les langues disponibles

X.3.1.1 Maintain a minimum depth of 9 inches of loose-fill materials such as wood mulch/chips, engineered
wood fiber (EWF), or shredded/recycled rubber mulch for equipment up to 8 feet high; and 9- inches of sand or
pea gravel for equipment up to 5 feet high. NOTE: An initial fill level of 12 inches will compress to about a 9-
inch depth of surfacing over time. The surfacing will also compact, displace, and settle, and should be
periodically refilled to maintain a least a 9- inch depth.
Twice a month during play season:
Tighten all hardware.
Check all protective coverings on bolts, pipes, edges and corners. Replace if they are loose, cracked or
missing.
X.3.1.1 Loose-Fill Materials:
X.3.1.1 Maintain a minimum depth of 9 inches of loose-fill materials such as wood mulch/chips, engineered
wood fiber (EWF), or shredded/recycled rubber mulch for equipment up to 8 feet high; and 9- inches of sand or
pea gravel for equipment up to 5 feet high. NOTE: An initial fill level of 12 inches will compress to about a 9-
inch depth of surfacing over time. The surfacing will also compact, displace, and settle, and should be
periodically refilled to maintain a least a 9- inch depth.
Once a month during play season:
Check all moving parts including disks, ropes, cables, and chains for wear, rust, or other deterioration. Replace as
needed.
At the end of each play season or when the temperature drops below 32 Degrees Fahrenheit take in your
NINJAROPE™ and store indoors in cool dry location.
X.3.1.1 Loose-Fill Materials:
X.3.1.1 Maintain a minimum depth of 9 inches of loose-fill materials such as wood mulch/chips, engineered
wood fiber (EWF), or shredded/recycled rubber mulch for equipment up to 8 feet high; and 9- inches of sand or
pea gravel for equipment up to 5 feet high. NOTE: An initial fill level of 12 inches will compress to about a 9-
inch depth of surfacing over time. The surfacing will also compact, displace, and settle, and should be
periodically refilled to maintain a least a 9- inch depth.
TRAIN LIKE A NINJA! HAVE FUN WITH YOUR NINJAROPE™! ALWAYS BE SAFE!
Other exciting NINJALINE™ products available from b4Adventure (sold separately) ......
SLA.788 NINJALINE Intro Kit
b4 Adventure 4010 Holly Street Unit 16 • Denver Colorado 80216 • 1-844-834-4334
QUESTIONS?
info@b4Adventure.com ·
www.b4adventure.com
303-339-0482 -
DC:070218
4

Publicité

loading