Flush Mount Installation
Hand thread projector mount assembly (A) into ceiling plate (B) as shown in figure 2.1. Align the notch of projector
2
mount assembly with one of the four holes in ceiling plate (B) and secure with an M5 x 10 mm socket pin screw (K)
using allen wrench (O) as shown in detail 1.
NOTE: Slotted set screw (N) is used to jam against the threads of the projector mount assembly to prevent any
excess movement of the projector mount assembly (A). Do not overtighten screw; overtightening screw will damage
threads making it difficult to separate projector mount assembly from ceiling plate.
NOTCH
N
K
B
A
DETAIL 1
fig. 2.1
6 of 27
ISSUED: 08-13-09 SHEET #: 056-9023-7 09-10-12