Table Des Matières - peerless-AV PAG-UNV Instructions De Montage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Note: Read entire instruction sheet before you start installation and assembly.
• Do not begin to install your Peerless product until you have read and understood the instructions and warnings
contained in this Installation Sheet. If you have any questions regarding any of the instructions or warnings, for US
customers please call Peerless customer care at 1-800-865-2112, for all international customers, please contact
your local distributor.
• This product should only be installed by someone of good mechanical aptitude, has experience with basic building
construction, and fully understands these instructions.
• Make sure that the supporting surface will safely support the combined load of the equipment and all attached
hardware and components.
• Never exceed the Maximum UL Load Capacity. See page one.
• If mounting to wood joists, make sure that mounting screws are anchored into the center of the studs. Use of an
"edge to edge" stud finder is highly recommended.
• Always use an assistant or mechanical lifting equipment to safely lift and position equipment.
• Tighten screws firmly, but do not overtighten. Overtightening can damage the items, greatly reducing their holding
power.
• This product is intended for indoor use only. Use of this product outdoors could lead to product failure and personal
injury.
• This product was designed to be installed on the following wall construction only;
WALL CONSTRUCTION
• Wood Stud
• Wood Beam
• Solid Concrete
• Metal Stud
• Brick
• Other or unsure?
Tools Needed for Assembly
• stud finder ("edge to edge" stud finder is recommended)
• drill
• 5/16" (8 mm) bit for concrete
• 5/32" (4 mm) bit for wood joist
Table of Contents
Parts List.................................................................................................................................................................................3
Installation to Wood Joist Ceiling ............................................................................................................................................4
Installation to Solid Concrete Ceiling ......................................................................................................................................5
Flush Mount Installation..........................................................................................................................................................6
Extension Column Installation ................................................................................................................................................7
Attaching Adapter Plate to Projector.......................................................................................................................................8
Attaching Adapter Plate to Projector Mount............................................................................................................................9
Projector Alignment ................................................................................................................................................................9
WARNING
HARDWARE REQUIRED
Included
Included
Included
Contact Qualified Professional (not evaluated by UL)
Contact Qualified Professional (not evaluated by UL)
Contact Qualified Professional
2 of 27
ISSUED: 08-13-09 SHEET #: 056-9023-7 09-10-12

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Pag-unv-hd

Table des Matières