Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION

a) Installation work and electrical wiring must be done by qualified person(s) in accordance with
all applicable codes and standards, including fire-rated construction.
b) Sufficient air is needed for proper combustion and exhausting of gases through the flue
(chimney) of fuel burning equipment to prevent back drafting. Follow the heating equipment
manufacturer's guideline and safety standards such as those published by the National Fire
Protection Association (NFPA), and the American Society for Heating, Refrigeration, and Air
Conditioning Engineers (ASHRAE) and the local code authorities.
c) When cutting or drilling into wall or ceiling, do not damage electrical wiring and other hidden
utilities.
d) Ducted fans must always be vented to the outdoors.
TO REDUCE THE RISK OF FIRE OR ELECTRICAL SHOCK, DO NOT USE THIS BLOWER WITH
ANY SOLID-STATE SPEED CONTROL DEVICE.
INSTALLATION DETAILS
1. Read all instructions thoroughly before beginning installation. Note: These instructions apply
to Hestan's standard hoods only. Custom hoods may require additional consideration.
See "DUCTING DO'S AND DON'TS" on page 10.
Weight and size: For safe installation, at least two people should be present to lift and hold the
hood. For larger hoods and installations with duct covers, it is advisable to have a third person
present to assist.
Back Venting: If venting out the wall behind the vent instead of venting through the ceiling, see
"Back Venting" on page 17 for particulars.
2. When installing a wall mount range hood, it is recommended that the bottom edge of the hood
be located no more than 30" above the cooking surface for optimum performance.
3. Select the appropriate installation method.
Method 1 is suitable for applications where the top of the hood
(blower outlet(s) location) is accessible after the hood is mounted
on the wall and when a Hestan duct cover will be used.
NOTE: Since Hestan duct covers can be opened for access, they
can be installed with the hood and still permit access to connection
points. The duct cover frame requires that the hood and duct cover be
installed together.
Method 2 is suitable for applications where the top of the hood
(blower outlet(s) location) is not accessible after the hood is
mounted on the wall.
CAUTION
4. IF THE HOOD IS TO BE "BACK VENTED", PROCEED DIRECTLY TO
STEP 5.
Consult the connection diagrams (following) for further details on
exhaust outlet placement.
TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK, OR INJURY TO
PERSONS, OBSERVE THE FOLLOWING:
TO REDUCE THE RISK OF FIRE, USE ONLY METAL DUCTWORK.
Make sure that once the hood is mounted the
motor cooling vents are not obstructed.
Optional duct
cover
18"
30"
36"
©2018 Hestan Commercial Corporation
EN
11

Publicité

Chapitres

Table des Matières
loading

Table des Matières